Categories | Wind Tower Production Line |
---|---|
Brand Name: | Friendship Machinery |
Model Number: | FG |
Certification: | CE, ISO |
Place of Origin: | CHINA |
MOQ: | 1 |
Supply Ability: | 20 sete per month |
Delivery Time: | 30 working days |
Packaging Details: | wooden pallet, standard export package |
Pipe shape: | Rectangular |
Material: | Galvanized stee, Aluminum |
Thickness: | 0.5-1.2mm |
Warantee: | 1 year |
Name: | Air duct production line |
Voltage: | 380V |
Automatic Galvanizing Air Square Duct Production Line 3
Wind Tower Production Line
I. Advantage of Products:
· The latest design can resolve the problems like getting struck, too many repairs form roll-shearing displacements lock machine.
· The three-line bending function can crimp narrow edges and stably process 0.5-1.2mm galvanized sheet to avoid wasting.
· Mechanical arm clutching, locating and transferring platform
· Displacement lock machine
· Line 3 host+ Single rack
II. Function:
· It’s mainly for uncoiling, levelling, beading, punching, lockforming. Because of its small space requirement and easy to install and operate the machine can upgrade to “super line 4”.
III. Performance Features:
· All the rolling reels are made of bearing steel so that the lifetime prolongs by more than 5 times.
· Under the material-saving mode of CNC system, machine can withdraw material automatically after finishing tasks.
· With production memory functions, the production orders can be tracked and checked.
IV. Main Import Configuration:
· MITSUBISHI HMI Display And PLC
· MITSUBISHI Frequency Converter
· Japan NEMICON Inverter
· Taiwan Hydromax Pump
· Taiwan High Temperature Resistant Tubing
V. Basic Configuration:
· One electric coil cradles, 2 material trays (5-7t each roll)
· One rack
· One host (line3 host)
· One mechanical arm clutching, locating and transferring platform
· One displacement type locking machine
· One set of computer controlling system
![]() |