Categories | Rubber Mixing Machine |
---|---|
Brand Name: | SFC |
Model Number: | XK-400 |
Certification: | ISO, CE, SGS |
Place of Origin: | CHINA |
MOQ: | 1 SET |
Price: | US$6,000-20,000 |
Payment Terms: | T/T, L/C |
Supply Ability: | 50 SETS/MONTH |
Delivery Time: | 25 DAYS |
Packaging Details: | Plywood Case Packaging |
Condition: | New |
Warranty: | 12 months |
After-sales service provided: | Engineers available to service machinery overseas,Field maintenance and repair service,Video technical support,Field installation |
Color: | customization |
Working layer: | customized |
Roller hardness: | HRC 50 ~ 60 |
Bush: | bearing bush |
Voltage: | Customer's Request |
Power(w): | 37kw |
Rubber Mixing Mill with Anti Friction Roller Bearings
Technical Parameters:
USE:
This two roll rubber mixing mill machine is mainly used in Rubber &
Plastic Product factory for Natural Rubber Mixing(plasticating),
Raw Rubber and Compound mixing, rubber warm-up mixing and pressing
sheet.
Main features:
1. Rolls:
Chilled Alloy Cast Iron rolls with surface hardness 68~72HS. The Rolls are mirror finished & polished, duly grinded and are hollowed for cooling or heating.
2. Roll Clearance Adjusting Unit:
Nip adjustment at two roller ends is done manually using two separate screws attached to the brass housing body.
3. Roll Cooling:
Universal Rotary joints with inner Spray pipes with Hoses and Headers. Piping is complete up to supply pipe terminal.
4. Journal Bearing Housing:
Heavy Duty Steel Casting Housing fitted with Anti Friction Roller Bearings.
5. Lubrication:
Full Automatic Grease lubrication pump for Anti Friction Roller Bearings fitted in dust sealed housing.
6. Stand Frame & Apron:
Heavy Duty Steel Casting.
7. Gearbox:
Hard-tooth reduction gearbox, GuoMao brand.
8. Base Frame:
Common base frame heavy duty, Steel channel and MS plate fabricated accurately machined on which whole machine with Gearbox and motor are fitted.
9. Electric Panel:
Star Delta Electric operating panel with Auto Reversing, Voltmeter, Ampere, Overload protection relay, 3 Phase Indicator and Emergency Stop Switch.
Our Services
Our engineers can design target machines for customers and send
them the drawing to confirm. We are always on the side of saving
your cost.
In the process of production, we will take photos and send to
customers for their track the progress.
Documents such as packing list, commercial invoice, and bill of
lading etc. will be sent after the delivery.
We could supply free English foundation DWG, installation drawing,
user guide, maintenance manual and part drawing.
We supply overseas engineer service and help to train your workers
to operate the machine.
FAQ
1. Delivery time of the rubber machines?
This is specially designed machine according to your specific
requirement.
From engineer designing to production completion, it needs about 25
to 35 days.
2. What does your factory do regarding quality control?
We pay much more importance to quality control from the very
beginning to the end of production.
Every machine will be fully assembled and carefully tested before
shipment.
3. What's the machine quality guarantee?
Quality guarantee time is one year.We choose world famous brand
components to keep our machine in perfect working condition.
4. Are you able to give installation and commissioning overseas?
How long time will it take?
Yes, we can supply overseas service and technical support but
customer needs to pay for the cost of the installation.
Small machine usually takes within 2~3 days.
Big plant usually takes about 30 days.
5. How can I trust you to deliver the right machine as I ordered?
We will absolutely deliver a good quality machine as we discussed
and confirmed in the order.
The core of our company culture is innovation, quality, integrity
and efficiency. Also we have had much good cooperation with world
famous rubber production manufacturers. If you come to our factory,
we can show you're the user around us.
6. How can we go to your side?
We are located in Qingdao City, Shandong province, China. The name
of airport is Qingdao Liuting airport.
We will pick up you at the airport.
Packaging
Equipment painting completed before delivery, and then wrapped with
stretch film, avoid rubbing the paint off the surface, wooden
packaging can be customized, key parts, such as electronic control
box, will be wrapped by shockproof packaging materials, and then
packed in wooden cases.
![]() |