Categories | MES Manufacturing Execution System |
---|---|
Brand Name: | Linquan |
Certification: | ISO9001, CE |
Place of Origin: | China |
MOQ: | 1 |
Payment Terms: | L/C, D/A, D/P, T/T, Western Union, MoneyGram |
Delivery Time: | 30-90days |
Packaging Details: | pearl wool+protective film+wooden box |
usage: | system for equiment |
factory: | OEM&ODM |
warranty: | 1 year |
Advantage: | independent development |
Equipment function: | Effectively improve equipment efficiency |
used: | all Linquan equipment |
Linquan MES system for intelligent wiring harness processing speed
Linquan MES System Features:
1. Industrialization
Focus on the design and implementation of the overall intelligent factory scheme in the wiring harness industry.
2. Selectable
Select application modules and sequence based on actual conditions to gradually improve onsite control
3. Integrable
Seamless connecting with any third party system (ERP, WMS, PLM, etc.)
4. Professionalization
Integrate business practice experience with many wire harness customers in the industry to create the most competitive product platform
5. Customizable
Customized development on the basis of standard product functions to meet customer personalized needs
System Flow:
Order (Customer order management and customer relationship maintenance) → Intelligent production scheduling(Intelligently analyze production orders and assign them to corresponding equipment groups) → Raw material control(raw materials QR code scanning management )
→ Pre-engineering intelligent production(Product order information is automatically written into the
equipment, and it will automatically gives feedback after
production) → Post-engineering digital processing(All production data are associated with each process of
post-engineering through a QR code) → Finished goods storage(Intelligent scanning and
warehousing finished products )
Inteligent Production:
The Advantage of Linquan System:
A. Employee efficiency increased by 50%
B. Quality passing rate increased by 28%
C. Quality traceability completeness increased by 60%
D. Equipment management efficiency increased by 40%
E. Site turnover increased by 50%
F. Overall management specification increased by 50%
![]() |