Categories | Used Yarn Extrusion Line |
---|---|
Certification: | CE ISO |
Place of Origin: | China |
MOQ: | 1 set |
Price: | negotiate |
Payment Terms: | L/C, T/T |
Supply Ability: | 10 sets/month |
Delivery Time: | 15 days |
Packaging Details: | Wooden Case |
Design Speed: | 250m/Min |
Installing Power: | 4-10 |
Total Weight: | 25t |
Fibre Range: | 60-2000tex |
Max. Capacity: | 4500kg/24hours |
Stretching Ratio: | 4-10 |
Working Power: | 110kw |
Specification: | Around 38000X4800X2500mm |
Second-Hand Tape Extrusion Stretching Production Line Hard Wire Extrusion Machine
Descripition:
High speed flat film extrusion line is designed and developed on
the basis of foreign advanced technology, use computer control and
monitoring to make operation more easy and improve the stability of
machine operation.The main technical indicators of this machine
have reached the international advanced level, with fast speed,
high output, low energy consumption, good tapes quality, beautiful
appearance, smooth running, sensitive and reliable control,
excellent manufacturing technology, convenient operation, safety
and reliability. This machine is suitable for producing various
specifications of hard wire by PP or PE.
Technical Parameters:
Item | Parameter |
Fibre range | 60-2000Tex |
Design speed | 250m/min |
max. capacity | 4500kg/24hours |
Stretching ratio | 4-10 |
Installing power | 4-10 |
Working power | 110KW |
Size | Around 38000×4800×2500mm |
Total weight | 25T |
Machine Photos:
FAQ:
1. Are you trading company or manufacturer?
We are manufacturer, and also provide the business solution to all
the friends.
2. What's payment terms you accept?
The buyer make the 30% deposite,the 70% balance will be paid by TT
within 7 days before delivery or the buyer open 100% irrevocable
L/C at sight as the appointed bank of the seller.
3. What's the delivery time?
The seller will arrange shipment within 90working days once confirm
the order.
4. How to install and debug the machine after arrival?
We will provide instructions and installation videos. If the Buyer
needs engineers to install in the local area, the buyer should pay
USD150 per day for subsidy of engineers and afford the charge of
daliy life(including the daliy meal ,traffic and hotel) in the
locus of buyer and return tickets from China to User's factory.
5. Does it easy to operate and what can i do if it doesn't work?
First ,our machine is stable and easy to operate by one man ,what
you do is just learn some basic thing. And we will sent you manual
and video ,we suggest you to come to visit our factory to learn
more thing by yourself , and if there is something goes wrong , you
can call us ,video-chat ,email us . And we will give solutions
within 36 hrs .Our engineer also can be distributed to overseas as
you required.
6. How long is your machine's warranty period?
Seller warrants the products for 13 months from the B/L date.
![]() |