| Categories | Steel Stamping Dies |
|---|---|
| Brand Name: | IDO |
| Model Number: | Refrigerator door panel |
| Certification: | ISO9001 |
| Place of Origin: | China |
| MOQ: | 1 set |
| Price: | $10000-$50000 |
| Payment Terms: | L/C,T/T |
| Supply Ability: | 300 sets/year |
| Delivery Time: | 45days |
| Packaging Details: | Wooden Case, Anti-Rust Oil, Vacuum Packaging |
| Part Name: | Refrigerator door panel |
| Part Material: | SGCC |
| Mould Type: | Stage mold |
| Mould Size: | 1500*1100*550mm |
| Mould Weight: | 2T |
| Milling Speed: | Slow Speed |
| After-sales Service: | 12 Months |
| Smartness: | One-Key Changeover |
Steel Stamping Dies Stage Die for Refrigerator Door Panel Mould Size 1500×1100×550mm
Description:
The Steel Stamping Dies Stage Die for Refrigerator Door Panel with mould size 1500×1100×550mm is engineered for precise and efficient sheet metal forming. Made from high-quality steel, this stage die ensures consistent shaping of refrigerator door panel components, maintaining tight tolerances and reliable performance. Its robust design and ample mould size make it an ideal solution for appliance manufacturers seeking durable, high-precision, and high-efficiency stamping tooling.
Quick Detail:
Specifications:
Mould/Tool Type | Stage tool/mould/die |
Production Application | White Household Appliances (washing machine, refrigerator, dryer,
dishwasher…), Automobile (heat shield, radiator...) |
Metal Sheet Material | Stainless Steel (304, 430...), PCM, VCM, SGCC, Aluminum (6061,
6063,7075...), Copper |
Mould Material | V8, ASP60, P20, ASSAB88, XW-42, SKD11, DC53, CR12MOV, AMPCO25 |
Mould Base | SD, LKM Standard, HASCO Standard, Self-made, etc. |
Tolerance | ±0.003mm |
Hardness | Upon request |
Surface Treatment | TiCN/ Polishing/ mirror polishing/ plating/ heat treatment / Deep
Cooling or according to your parts |
Precision Machining | CNC/ surface grinding machine/ wire cutting/ EDM |
Measuring Instruments | CMM/ Profile projector/ electronic height gauge/ spectrum analyzer
/ caliper/ microscope/ micrometer, etc. |
Drawing Format | DWG, STP, STEP, X_T, IGES, PDF |
Design Software | Auto CAD, UG, Solidworks |
Trade terms | FOB (Shanghai) |
Mould Lead time | Generally 6~8 weeks (as per actual situation) |


|